Concrete FAQs, answered plainly.

Grouped by stage—from initial drawings and underground pipe checks through to pour-day finishes, control cuts and first-week curing care.

Quotes, Drawings & Planning

What you need on hand before requesting pricing or booking a pour.

What details should I include when requesting a concrete quote?+

Share your project suburb, what you are pouring (e.g. house slab, driveway, pathway, shed pad or commercial infill), approximate length, width and thickness, preferred finish, site access notes, and PDF copies of structural/architectural drawings if engineered.

Do you design or certify structural slabs in-house?+

No. Structural slab and footing design must be completed and certified by an appropriately qualified structural engineer based on geotechnical soil information. We construct concrete works to your supplied engineering drawings and project specifications.

Is the online Concrete Calculator accurate enough to book a concrete truck directly?+

Our calculator provides a fast geometric volume estimate (plus a 10% allowance) for simple flat rectangles. Structural slabs with edge beams, internal ribs, steps or sloping ground require a detailed plan and site measure before ordering batch concrete.

Do I need council or building permit approval before pouring concrete?+

Habitable house slabs, extensions, garages, structural retaining footings and council road crossovers generally require permits or council consent obtained by the owner or head builder prior to construction. Check with your local council or registered building surveyor early.

Site Preparation, Services & Access

Groundworks, underground pipes, pump setups and tight-access logistics.

How do we check for underground pipes or cables before excavation?+

A free Before You Dig Australia (BYDA) enquiry shows public utility mains near the boundary, while owners and builders should also flag private underground services—such as stormwater drains, water pipes, septic lines, pool plumbing or garden power—before excavation begins.

Can you remove grass, soil or an old cracked driveway first?+

Yes. Stripping turf and topsoil, breaking out existing concrete, lawful spoil removal and compacting a crushed-rock base can all be itemised clearly in our Site Preparation and Groundworks scope.

What if a concrete truck cannot back right up to the slab area?+

That is common on rear yards, battle-axe blocks and inner-suburban streets. Concrete line pumps run hoses through side gates or garages, while boom pumps reach over obstacles where overhead powerlines and council permits allow.

When do plumbers and electricians complete under-slab rough-ins?+

Under-slab drainage, water lines and electrical conduits are installed after initial pad preparation/boxing and before final vapour-barrier taping, steel chairing and pre-pour engineering inspection.

Pour Day, Finishes & Control Joints

How surfaces are finished, why joints are cut and how weather is handled.

Why do new concrete driveways and slabs have lines cut into them?+

All concrete shrinks slightly as excess water evaporates during curing. Tooled or saw-cut control joints create straight, planned weak planes so natural drying contraction occurs neatly inside the joint rather than wandering randomly across a bay.

What concrete finishes can I choose from?+

Depending on the application, common finishes include steel-trowelled internal floors (ready for floor coverings), slip-conscious broom or stipple finishes for driveways, paths and ramps, coloured oxide mixes, and exposed aggregate.

What happens if heavy rain or extreme heat is forecast for pour day?+

Pouring into heavy rain damages surface paste, and extreme hot winds risk plastic shrinkage cracking. We review weather radar, wind and temperature ahead of pour day so pours can either be protected properly or rescheduled safely.

Curing, Traffic Timing & Repairs

Looking after fresh concrete in the first month and assessing existing slab damage.

How soon can we walk or drive on newly poured concrete?+

As a general guide for standard mixes in mild weather, keep pets and foot traffic off for at least 24–48 hours, wait at least 7 days before parking standard passenger cars on a driveway, and allow up to 28 days for concrete to reach design benchmark strength before heavy loads.

How should I look after my slab in the first week?+

Keep the surface evenly cured as advised at handover (such as light misting or leaving applied curing protection undisturbed), avoid dragging sharp tools or stacking heavy pallets on green edges, and keep sprinklers from pooling cold water unevenly on hot slabs.

Can cracked or sunken concrete bays be repaired without replacing everything?+

Often yes—where damage is isolated (such as a tree-root lifted pathway bay or a plumber trench cut-out), saw-cutting along nearest joints, reinstating the base and pouring a fresh dowelled bay removes trip hazards cleanly.